Resident Electrical Engineer - Data Center Construction (m/f/x)

Randstad Professional GmbH (vorm. GULP)
Ansprechpartner: Matthias Steckiewicz
Frankfurt am Main,  Deutschland
40% RemoteFreiberuflichab sofortDauer 12 Monate100% Auslastung

Beschreibung

The Electrical employee provides specialist oversight of all Electrical works for the Electrical workstream across the Data Center Hall, MDA, Electrical Building, and Electrical Yard.

Your Tasks
  • Reviewing and assuring Electrical design documentation, drawings, specifications, and submittals (including power distribution, lighting, containment, earthing, and fire systems) for compliance with BOD and client's standards.
  • Monitoring and inspecting on-site Electrical installation activities across the Data Center Hall (DCH), Main Distribution Area (MDA), Electrical Building (EBA), Electrical Yard (EYD), and associated areas.
  • Reviewing Electrical submittals, equipment approvals, Factory Acceptance Tests (FAT), and Non-Conformity Reports (NCRs).
  • Participating in Construction Hold Point inspections and witnessing Electrical system tests and energization activities.
  • Coordinating with the HV & OFE OR on interface activities between Electrical scope and the Perun HV substation works.
  • Providing technical input to the MEP QS on Electrical scope progress assessments and payment application reviews.
  • Identifying risks within the Electrical workstream and escalating to the Construction Manager with recommended solutions.
  • Supporting pre-commissioning, commissioning, and snagging activities for all Electrical scope items
Our Requirements
  • Engineering qualification in Electrical Engineering or Building Services Engineering
  • Ability to review electrical schematics, single-line diagrams, and specifications
  • Hands-on experience supervising electrical installations on data centres or high-specification commercial or industrial projects
  • Understanding of data centre electrical infrastructure (MV/LV switchboards, UPS, PDUs, busbar systems)
  • Knowledge of HV/LV power distribution systems, UPS, switchgear, and generator installations relevant to data centres
  • Familiarity with electrical safety legislation, CDM regulations, and permit-to-work systems
  • Experience witnessing FATs, energisation activities, and electrical system tests
  • Strong NCR management and reporting skills
  • Certification required: Electrical Engineer

Bewerben