Profilbild von Christof Hertkorn Software Test Manager ISO29119 aus Bern

Christof Hertkorn

nicht verfügbar bis 30.06.2024

Letztes Update: 17.04.2024

Software Test Manager ISO29119

Firma: integral design concepts
Abschluss: Diplom-Informatiker (Technische Universität Karlsruhe)
Stunden-/Tagessatz: anzeigen
Sprachkenntnisse: deutsch (Muttersprache) | englisch (gut) | französisch (Grundkenntnisse) | polnisch (gut)

Dateianlagen

christof_hertkorn_profile_20210119.docx

Skills

Keyword-based Testing , agile testing, test automation, defect management, test management, software development, V cycle, DevOps, Scrum, Kanban, Obeya, SPICE, CMMI, ISTQB-Foundation
UML, SDL, MSC, C++/C, C#, Robot, Perl, Java, QNX, vxWorks, linux, Windows, HarmanBecker/IdeaSoft MoCCA-Framework, Jira, Confluence, MS Azure DevOps, Xray, Jenkins, Jama, git, Mantis, GitLab, pyCharm, Mantis bugtracker
ETCS, SCMT, PZB/LZB, MKS, DOORS, Vector vTestStudio, Cantata, TESSY, Serena Dimensions, Enterprise Architect, Rational ClearCase & ClearQuest, Bugzilla, LotusNotes, Eclipse, DOORS, CAN, CANoe, Change, MS Office, RapidPlus 8.1, WindowsXP, Momentics, C++, XML, SGML, DSP, FPU, DSP

Projekthistorie

11/2020 - 04/2024
Software Test Manager AWAP-light
SBB (via Expleo) (Transport und Logistik, >10.000 Mitarbeiter)

Test management: case specification, validation, reporting, build test framework for automation,
regression tests
AWAP-light system integration tests to be executed manually and to be shifted
to automatic regression tests in heterogenous, distributed system
Agile direct, problem-centered communication together with business
analysts/requirement engineers, software developers, product owner,
stakeholders, customer (SBB) and suppliers
12 person project, international team, agile. Polarion, ILTIS, Stellwerksimulator, SBB-specific
systems

11/2023 - 02/2024
Test Manager (Interim)
Obergericht des Kantons Zürich (via Expleo) (Öffentlicher Dienst, 500-1000 Mitarbeiter)

Agiles Test-Management begleitend zur Einführung einer neuen Software-Generation für alle Notare und Notariate des Kantons Zürich
Koordination und Management von Tests auf Abnahme-, End-to-End-, System- und Systemintegrationsniveau sowie Schnittstellentests
Schliessen der Lücke zwischen Software-Lieferant und Endabnehmern (Notariatsmitarbeiter)
Aufsetzen, Organisieren und Durchführen von agilen Testrunden mit freiwilligen Testpersonen im 4-Wochen- Rhythmus bis zum Roll-Out
Schulungen, Begleitung, Führung der Testpersonen hinsichtlich Testfall-Ausführung, Bug-Erstellung Defect-Management mit allen Beteiligten (Auftraggeber; dessen Endkunden, die Notariate; dessen Lieferanten und dessen externe Berater)
Koordination der verfügbaren Testfall-Ersteller
Parallel dazu Aufbau der Testautomatisierung
Tools & Technologien: Microsoft Azure DevOps, Microsoft Office, Confluence

03/2022 - 08/2023
Test Manager STA SystemTestAutomat für RCS Rail Control System
SBB (via Expleo) (Transport und Logistik, >10.000 Mitarbeiter)

Betreuung, Wartung und Betrieb der Automatisierten Tests für verschiedene Features des RCS (Rail Control System) der SBB:
Nächtlich zyklische Smoke-, Regressions- und Fachtests müssen up to date gehalten werden, vorhandene Testfälle überarbeitet,
neue Testfälle entwickelt,
der STA (Systemtest-Automat) selbst ist immer wieder anzupassen.
Ausserdem Ueberwachung der nächtlichen Komponenten-/Unit-tests der 10 RCS-Entwicklerteams.
Tools & Technologien: Java 11, Java 17, Eclipse, Jira, Xray, git

05/2021 - 03/2022
Test Manager / Defect Management
SBB (via Expleo) (Transport und Logistik, >10.000 Mitarbeiter)

Durchfahrende Züge und Fahrzeuge werden per Kameraportal aufgenommen, die Bilder mit Datenbanken abgeglichen und so pro Fahrzeug (Achse, Rad, usw.) dessen Zustand "en passant" verfolgt.
Die Software WIN, die insbesondere die zeitlichen Verläufe zum Thema hat, ist dies aus System- und Abnahmeebene zu testen und die Defects entsprechend zu managen.
Da es verschiedene Stakeholder mit unterschiedlichen Interessen im Projekt gibt (Personenverkehr, Cargo, Infrastruktuarbteilungen), sind auch unterschiedliche Anforderungen und Perspektiven zu berücksichtigen. Vorbereitend zu den Abnahme- und Systemvalidierungstests wurde eine Tool-Evaluierung vorgenommen und Jira, Xray & insbesondere Structure für die gesamte Kette Requirement-Testfallspezifikation-Defect im Projekt eingeführt.
Da die Requirements in Polarion verwaltet werden, wurde eine funktionsfähige Bridge PolarionJira gemeinsam mit der entsprechenden Abteilung aufgesetzt.
Tools & Technologien: Jira, Structure, Xray, Polarion, Excel

12/2019 - 12/2020
Software Test Manager TWM Middleware
SBB (via Expleo) (Transport und Logistik, >10.000 Mitarbeiter)

Transition of Testing to DevOps, test automation, test framework setup, test case specification,
validation, reporting, automation, regression tests
Midleware is to be verified by tests:
Non-functional tests for wireless transmission of data message telegrams
between central train control system server and mobile device for the train
driver have to be specified, and executed; coping with both requirement-based
tests for validation reports, and use-case based tests to enable maximum
customer satisfaction;
Agile approach by direct, problem-centered communication in scrum-team together
with business analysts/requirement engineers, software developers, product
owner, stakeholders
12 person project (being part of 80 person team), international team, agile. Jira, Confluence, Xray,
Jenkins, DevOps, Agile, Scrum, Kanban, SBB-specific railway control systems: RCS, ADL, WarnApp

01/2018 - 07/2019
Software Test Train Driver-DMI
DEUTA GmbH

(SBB/Siemens EC250, EC250-2, Flirt Tilo CBT, Flirt Tilo E2W, SOB , DB/Siemens
ET420)
Agile software test case specification, validation, reporting, automation, test plan definition &
maintenance, regression tests
Software system tests of instrument clusters (DMI) of high-speed and commuter
trains:
Specification of testcases with Jama; Implementation with Robot using Keywords,
maintained with git; regression tests with Jenkins, report generation of
automated testsuites as well as manual test execution; coping with both
requirement-based tests to reach 100% coverage for validation reports, and
use-case based tests to enable maximum customer satisfaction; bug reporting and
change request tracking with Mantis
Agile adaption to changes: if by changing customer requests, late adjustments
of requirements (with consequences for test case specifications,
implementations, and result interpretation), testcases that needed to be
corrigated (with consequences for result interpretation), regression test
result evaluation and configuration & version management
Agile approach by direct, problem-centered communication within the testing
team as well as between the three involved teams 'requirement engineering',
'software development', and 'testing team', together with the intensively
involved customer
8 person project (being part of 20 person team), international team, agile. Robot keywords
framework, GitLab, JAMA, pyCharm, Jenkins, Mantis bugtracker, ubuntu, ETCS(SCMT,PZB/LZB), MVB

06/2016 - 12/2017
Software Testteam Lead Near Field Camera
Magna Electronics

Systems for Ford, Daimler, Chrysler etc
Agile software test team coordination, test case specification, validation, reporting, automation,
test plan definition
Coordination of different off-shore software test teams for sw component &
integration and software tests in the area of rear view cameras, surroundview
systems, ultrasonic park assists for various automotive OEMs:
Translate the (partly changing) customer requirements into the client´s system
requirements
Ensure bilateral traceability between customer and system requirements
Analyze requirements for feasibility, risk, testability, traceability (SPICE,
CMMI)
Agile adaption to design changes as well as requirement corrections, tracking,
coverage control, with PTCintegrity
8 person project, international, inter-cultural, agile, PTCintegrity (former MKS), DOORS,
vTestStudio, Cantata, TESSY, Enterprise Architect

01/2017 - 10/2017
Machine Controller HiL
BSH Hausgeräte GmbH

Scrum "agile" software test team collaboration, test case specification, validation, reporting,
automation, scrum
Test and test automatisation of control units for washing mashines and dryers
in an international agile scrum test team
Scrum was supported formally using JIRA
12 person project, international, inter-cultural, SCRUM, Serena Dimensions, JIRA, DOORS, proprietary
test environments

03/2013 - 02/2016
Software Test
Bombardier Transportation

PIES TCMS for TWINDEXX Do2010 "Iron Bird Light"
Software & system test case specification, validation, reporting, automation
Test and test automatisation for PIES (passenger information and entertainment
system) integrated to TCMS (train control and management system) for european
TWINDEXX double-decker trains
Due to the nature of PIES, integration tests have often to be executed
semi-automatically using real subsystem devices to get feedback of the
interplay of the several involved components. In opposite to pure TCMS tests,
PIES+TCMS integration tests live from human evaluation of the feedback.
Therefore, to provide software development department with fastest feedback,
the test focus for PIES+TCMS integration was moved to script-based
semi-automatic testcases.
Additionally, level 2 & 3 test execution for PIES related subsystem controllers
as VCS (audio), TFT and dot-matrix displays for PIES, PCS (passenger counting)
& SRC (seat reservation)
Enhancing proprietary test tool infrastructure for MD telegrams and other
improvements as automated coupling
60 person project, inter-disciplinary, international, inter-cultural
C# (implemented offshore), VisualStudio, Enterprise Architect, Rational ClearCase & ClearQuest,
DOORS, proprietary test management and test execution software, proprietary test script language
(java style), Bugzilla, MSOffice, LotusNotes

04/2011 - 02/2013
Software Test
Bombardier Transportation

PIES TCMS for Commuter line BR430
Software & system test case specification, validation, reporting, automation
Test case development, implementation, execution, and test automatisation for
integrating PIES into TCMS. In addition, level 3 test execution for VCS audio
subsystem
20 person project, inter-disciplinary, international, inter-cultural
Eclipse, Enterprise Architect, proprietary test management and test execution software, proprietary
test script language (java style), Rational ClearCase & ClearQuest, MSOffice, LotusNotes

06/2010 - 03/2011
EEFH / Test Team Lead for cross-platform (MQB/MLB)
Volkswagen AG

Infotainment-HMI-Development
Agile software test team lead, organisation of input and output tests, feedback for the
HMI-development
Agile software test team lead handling all corresponding tasks in technical and
organisational fields, including communication and reporting to continously
changing demands
The team accomplishes all tests in the field of HMI in the department "HMI
systems engineering, HMI / combination and control elements (EEFH)" for the new
HMI components for both cross-carline families MQB and MLB. This involves all
necessary tasks in the field of testing (evaluation of testoptions, especially
test automation, test specifications, coordination of test constructions and
test executions), including configuration management and changing requirements
which forced to agile testing to assure quick adaptions, restructuring of
testplans and reports, etc
5 person project (being part of an 80 person team), inter-disciplinary, international,
inter-cultural, agile
DOORS, Java, Eclipse, CAN, CANoe, Bugzilla, MSOffice

03/2009 - 06/2010
Software Test Lead Engineer
Lear Corporation GmbH

Bentley-Naim-Amplifier w. MOST interface
Agile software test team lead, creating testcases, test automation, test execution and reporting
For the different maturity levels, tests, as well as automated, semit-automated
and manual, test plan execution in a globally distributed team, and test
reporting
Agile cooperation und collaboration with software, hardware requirement
engineering and development
Creating, compiling and reviewing test specifications
Coordination of test constructions and test executions, also in the vehicle,
creating reports.
Also test executions for other vehicles of the Volkswagen-group (D4, VW
Touareg, Audi B8)
10 person project, inter-disciplinary, international, inter-cultural, agile
MOST, CAN, CANoe, Synergy, Change, DOORS, MS Office

06/1996 - 06/1997
Technical Documentation
Reinisch GmbH & Co KG

Bidirectional SGML-Layout-Conversion for a HP Redaction system at Mercedes-Benz
C++, SGML, Adobe FramemakerSGML

08/1986 - 04/1990
Fortran77
TDV GmbH

Part-time during studies
Porting a decision table system from DEC VMS to PC-DOS and UNIX-Derivates (AIX,
HP-UX, Ultrix) and to Norsk Data Sintran.
Fortran77

09/1984 - 09/1985
Assembler

port RS-232)
Part-time during studies
Programming an EPROM with Turbo Pascal, and Inline Code and Z80-Assembler

Zertifikate

ISTQB-Foundation-2018
2020

Reisebereitschaft

Verfügbar in den Ländern Deutschland und Schweiz
Profilbild von Christof Hertkorn Software Test Manager ISO29119 aus Bern Software Test Manager ISO29119
Registrieren