Offshore Wind Farm Senior Authorised Person 132KV

Germany  ‐ Vor Ort
Dieses Projekt ist archiviert und leider nicht (mehr) aktiv.
Sie finden vakante Projekte hier in unserer Projektbörse.

Schlagworte

Beschreibung

Offshore Senior Authorised Person 132KV Required for Offshore Wind Farm in German Waters.

My Renewable energy client is looking for a Senior Authorized Person (400 kV) to work in the NE UK. The role is to start ASAP until December 2014 (initially).

Working Pattern: 12 hours a day/7 days a week shift pattern for 2 weeks on duty followed by a 2 weeks off duty period. However, 3 weeks on duty periods may occur if required. The SAP will be required to work offshore as well as onshore.
Job Description:
- Implement the high voltage safety rules
- Outage management and network control
- Carry out high voltage switching and isolations
- Carry out earthing of high voltage plant and apparatus
- Prepare, issue and cancel safety documents
- Inspect, test and commission high voltage plant and apparatus
- VLF testing of high voltage cables
- Identify and fit circuit designation labels and switch numbers
- Prepare and check high voltage switching schedules
- Fault management
- Participate in an out-of hours emergency response rota
- Collate site and network information to facilitate effective decision making within the department
- Update HV schematic diagrams
- Inspect work sites and perform site safety inspections
- Check Safety Documents
- Implement and provide training programmes for manual and technical staff (CP, AP, etc.)
- Provide technical and engineering advice to working parties
- Assist the O&M department when required
On-Call: The SAP may be required to be On-Call during the duration of the contract to provide emergency support outside of normal working hours.
For being On-Call the Consultant will receive a Standby rate. In the event of a Call-Out whilst being on Standby during the On-Call period, the Consultant shall receive a Call-Out sum based upon an hourly rate for the duration of the call out. The details will be discussed at application.
Qualifications & Knowledge:
Currently Senior Authorised Person at 155 kV or higher
Electrical and/or Electronic Engineering degree or equivalent.
Technical knowledge of wind farm layout.
Offshore requirements, including:
- First Aid
- Offshore medical
- Working at height with rescue
- PST, personal survival techniques
- GWO Helicopter Underwater Escape Training
-
Start
05/2015
Dauer
12 months
Von
Huxley Associates
Eingestellt
03.06.2014
Projekt-ID:
718832
Vertragsart
Freiberuflich
Um sich auf dieses Projekt zu bewerben müssen Sie sich einloggen.
Registrieren