Beschreibung
Offshore Senior Authorised Person 132KV Required for Offshore Wind Farm in German Waters.My Renewable energy client is looking for a Senior Authorized Person (400 kV) to work in the NE UK. The role is to start ASAP until December 2014 (initially).
Working Pattern: 12 hours a day/7 days a week shift pattern for 2 weeks on duty followed by a 2 weeks off duty period. However, 3 weeks on duty periods may occur if required. The SAP will be required to work offshore as well as onshore.
Job Description:
- Implement the high voltage safety rules
- Outage management and network control
- Carry out high voltage switching and isolations
- Carry out earthing of high voltage plant and apparatus
- Prepare, issue and cancel safety documents
- Inspect, test and commission high voltage plant and apparatus
- VLF testing of high voltage cables
- Identify and fit circuit designation labels and switch numbers
- Prepare and check high voltage switching schedules
- Fault management
- Participate in an out-of hours emergency response rota
- Collate site and network information to facilitate effective decision making within the department
- Update HV schematic diagrams
- Inspect work sites and perform site safety inspections
- Check Safety Documents
- Implement and provide training programmes for manual and technical staff (CP, AP, etc.)
- Provide technical and engineering advice to working parties
- Assist the O&M department when required
On-Call: The SAP may be required to be On-Call during the duration of the contract to provide emergency support outside of normal working hours.
For being On-Call the Consultant will receive a Standby rate. In the event of a Call-Out whilst being on Standby during the On-Call period, the Consultant shall receive a Call-Out sum based upon an hourly rate for the duration of the call out. The details will be discussed at application.
Qualifications & Knowledge:
Currently Senior Authorised Person at 155 kV or higher
Electrical and/or Electronic Engineering degree or equivalent.
Technical knowledge of wind farm layout.
Offshore requirements, including:
- First Aid
- Offshore medical
- Working at height with rescue
- PST, personal survival techniques
- GWO Helicopter Underwater Escape Training
-