Beschreibung
A Global Renewable Energy client is looking for a Client Representative to work on an offshore wind farm project. The client is looking for the Client Representative to be able to start this role approx. end of June for approx. 3 - 6 months approx. Shift pattern would be 14 days on/14 days off rotation.Responsibilitity
Main Tasks of the Client Representative will be:
Offshore attendance of final installation works of TP
- Flanged MP/TP connection à bolting/shimming works/bolt tightening supervision
- Bolt installation works on Air Tight Deck in the MP
- Paint Repair if required
- Installation of cable supports
- Installation of Roxtec sealings
- Removal of installation equipment from TP (manual hoisting operations)
- Securing of TP crane
- Reinstallation of Latchway tether line
- Wedge Adapter securing (drilling of bolts holes) and washer plate installation (if applicable only on specific locations)
- Check of cable installation equipment (still in place and condition)
- Final walk trough/Offshore acceptance process
- DPR and documentation
- Communication to Back Office where applicable
Qualification:
- Engineer background or will have worked in a similar role and performed similar tasks