1 Purpose of role
The role of a Civil Works Supervisor (CW-Supervisor) is:
• To prepare proposal for realize telecom sites
• To work interactive with customer and GU/ASP
• To order and bill GU and ASP services
• To coordinate construction and implementation of sites
• To work interactive with acceptance and quality responsibles
• To fulfill the expected reporting towards SiteHandler
2 Tasks and responsibilities
2.1 Key tasks and responsibilities for site construction
Preparing of preliminary design (Rotstift) aligned with customer for clearing with landlord.
Scheduling and attendance of construction meeting and BTB along with construction agency, structural- and electrical engineer.
Covering and documentation of inventory defects on site (incl. Foto doku).
Report of inventory defects and appropriate incremental cost report forwarding to customer.
Preparing of BTB-protocol with respect to operational safety contenting the following: rack layout, room layout, DC layout, lightning protection layout, power layout, antenna and radio layout.
Alignment of preliminary design and BTB-protocol with respective adjustment.
Ordering of design engineering (EP) incl. statics.
To obtain acceptance of design engineering (EP) from customer.
Monitoring of data by GU related to detailed engineering (AP), static calculation and assembly drawings incl. parts lists.
To ensure construction permission relative to customer and BNetzA.
Control and clearing certificate of performance (CoP) in terms of planning. Transfer for creating credit voucher.
Preparing of site specific civil works order for GU / ASP.
Handover of complete site specific documentation towards GU / ASP.
Call off Ericsson system hardware via site handler (SH) incl. monitoring of delivery.
Call off crane via SH.
Request for installation and integration via TTWOS tickets.
Inspection of operational safety during installation – fulfilled by acceptance specialist.
2.2 Key tasks and responsibilities for site implementation
Scheduling and coordination of installation time frame (Landlord, GU, ASP, public authorities).
To claim and check the delivery notes concerning Ericsson hard ware.
Verification of interference- and incremental costs from GU / ASP and forwarding to customer when indicated.
Enabling site for acceptance and appoint the appropriate time frame towards acceptance specialist and GU / ASP.
2.3 Key tasks and responsibilities for documentation & acceptance
Check up of site documentation prepared by GU and/or ASP. Deposition of the final documentation into the relevant tools (e.g.SH).
To place and monitoring removal of faults based on the agreed acceptance protocol.
Indicate finished and fault-free sites for commissioning with consolidation of the quality responsible.
Check up of CoP and compare to the ordered items and quantity, transfer for creating credit voucher.
2.4 General tasks
By day reporting of status via Site Handler and customer PM-tool, status monitoring.
Cost control.
Efficiency control of GU and ASP
3 Authorities
CW-Supervisor has to place purchase orders to the relevant GU and ASP. In this process existing frame contracts negotiated by sourcing have to be utilized.
Approving of CoP (certificate of performance) in terms of construction, civil works and system engineering.
4 Interfaces
Interfaces and communication between CW-Supervisor and project/network rollout stakeholders shall be defined in the rollout- or respective project process. Interfaces includes usually and are described in detail by process plan:
Internal: Project Manager, Line Manager, Working Group, Customer Unit, Supply Chain Management.
External: Customer, GU, ASP, Public Authorities.
5 Potential performance measurements
Success could be measured in terms of:
• First time right (determined via Site Handler analysis)
• Customer agreed lead times (also via SH analysis)
• Construction and installation quality (quality index provided by quality responsible)
6 Role requirements
6.1 Qualifications & experience
Construction engineer and/or electrical engineer (technical college or graduated degree).
Experiences from construction and installation of telecommunication sites are recommended urgently.
6.2 IS/IT tools and access
Windows office packet, basic need.
ACAD, beneficial.
Site Handler and customer related tools, have to be adopt.
6.3 Additional requirements
Certificate of G41 checkup
Certificate of climbing and rescue training.
Certificate of medical emergency training.
6.4 Competence requirements
Engineer, Technician, German and English language
Start
11.2016
Dauer
6 Monate
(Verlängerung möglich)
Von
First Point Group GmbH
Eingestellt
27.06.2016
Ansprechpartner:
Stephan Hennies
Projekt-ID:
1155123
Vertragsart
Freiberuflich
Um sich auf dieses Projekt zu bewerben müssen Sie sich einloggen.
Registrieren