AL

Alexander Lächele

verfügbar

Letztes Update: 04.03.2024

Project Manager

Abschluss: Bachelor
Stunden-/Tagessatz: anzeigen
Sprachkenntnisse: deutsch (Muttersprache) | englisch (gut) | französisch (Grundkenntnisse)

Dateianlagen

Alexander-Laechele-CV-2024-EN_040324.docx

Skills

Data Centre Migration
Cloud Migration Azure/AWS | Private Cloud | Strategy & Execution | Conception & Realisation of Server Consolidations | Installation and Operation of Citrix Server Farms | Bug Identification & Resolution | Coaching | Administration & Support | Technical Project Management of Windows-Based Networks & Server Environments
Application Migration
Continuity of Services | Effective Migration Scheduling | Resource Requirements and Allocation | Application Ownership Management |Technical Migration Team Management | Legal and Compliance Considerations | Resource Planning | On-Boarding Organisation | Technical Resource, Network Server, Storage Availability | Security Considerations
Integration / Migration 
Migrations of Netware to Windows | Migrations NDS to ADS | Mail-Migrations to Exchange
Key IT Skills
Operation Systems / PlatformsWindows 2000 / 2003 / 2008/ 2012 | XP | Windows 7 | Windows 8.1 | Unix | Linux | Sinix | Novell Netware
TechnologiesVMWare | Windows Serve | Citrix XenDesktop 7 / XenApp 6 / Presentation Server 4.5 | 4.0 / Metaframe XP | Citrix PVS 5 & 6 | Microsoft App-V 5 | Microsoft II | Microsoft SQL Server 2005 & 2008 | Microsoft Certificate Services | Microsoft Exchange | Quest Migration Manager | ADS | NDS | DNS | WINS | DHCP | VPN | Checkpoint Firewall | Cisco Switches 
Microsoft Office| Microsoft Office 365 | SAP BPC
Microsoft Network EnvironmentMicrosoft Cluster | ISA Firewall Microsoft Operations Manager | Microsoft Network Load Balancing | Internet Information Server 5 | Biztalk Server | SharePoint Portal Server | .Net Framework | Exchange 2000 Cluster | SQL Server 2000 Cluster | Materna WAP Server Mobile Information Server | Citrix Metaframe | Microsoft Terminal Server | TrendMicro Virus Scanner | EMC SAN
Database Management SystemMS-SQL Server
Tools & SystemsCA-Unicenter |Tivoli | NetView |Microsoft OfficeSwitzerland | MS-Visio |Microsoft Exchange, Lotus Notes | MS Project

Projekthistorie

Career Summary
ConsultantApril 2017 – 

Trading Company, Zug, Birmingham (UK)
Responsibilities 
  • Setting up the business processes
  •  Determining the financial needs
  • Creating the IT concept

Project Manager, DC Exit ManagerNov 2015 – Mar 2017

Energy and Automation International, Zürich, Mannheim
Responsibilities 
  • Accountable for a data centre migration to an outsourced data centre, a Private Cloud as well as a Public Cloud
  • Migrated 560 applications and 1800 application servers from 48 data centres to a single, consolidated data centre
  • Managing application owners and technical teams to contribute to the defined objectives
  • Planning of resources and arranging technical board meetings
  • Leveraged expertise to identify and mitigate legal and compliance issues relating to the cross-border migration
  • Collaborated with the migration factory, including new and old outsourcing suppliers
  • Effectively collaborated with the transition manager to ensure continuity of services during migration 

Project Manager, Senior ConsultantAug 2014 – Oct 2015

Retailer, Germany
Responsibilities  
  • Accountable for migrating applications, including Windows File Services, to a new platform and new hosting sever, EMC NAS/SAN Systems, with minimal disruption
Technologies 
  • Windows Server 2003 | Windows Server 2008 R2 | Active Directory | Exchange | MS SQL | IIS | Tomcat | JBoss | Oracle SQL | Pervasive SQL | Introduction of Office 365

Senior ConsultantFeb – Apr 2014

Engineering Company, Switzerland 
Responsibilities 
  • Accountable for the planning, execution, progress reporting and documentation for the installation of a XenDesktop 7 environment 
Technologies 
  • XenDesktop | Windows Server 

Project Manager, Senior Consultant Sep 2013 – Jan 2014

Engineering Company, Switzerland 
Responsibilities 
  • Compiled budgets, determined timeframes, defined project scope and requirements for systems, virtualisation, data migration and migration of applications for a new IT environment  
Technologies 
  • VMware | Windows Server | MS SQL | IIS

Senior ConsultantSep 2012 – May 2013

Engineering Company, Switzerland 
Responsibilities 
  • Accountable for SAP BPC migrations, which included provisioning server infrastructure, installation of SAP BPC, formulating a disaster recovery plan and the execution thereof
Technologies 
  • Windows Server 2008 R2 | IIS | MS SQL Server

Technical Project Manager / ConsultantMay – Aug 2012

Engineering Company, Switzerland 
Responsibilities 
  • Accountable for design and installation of  Citrix XenApp 6 Farm and migrating applications of a Citrix Presentation Server 4.0 Farm  
  • Determined the basic infrastructure and installed Windows Server, XenApp infrastructure and applications 
Technologies 
  • Citrix XenApp 6.0 | Windows Server 2008 R2 | IIS | MS SQL Server

Senior ConsultantSep 2011 – Apr 2012

Energy Provider, Switzerland 
Responsibilities 
  • Accountable for migrating Citrix Presentation Server 4.5, running on Windows 2003, to XenApp 6, operating on Windows 2008 R2, ensuring image streaming with Citrix Provisioning Services, Application Virtualisation with Microsoft App-V
  • Migrated and installed Energy Trade Platform with Endur, Mesap, Trayport, Xeta/Eurex auf XenApp 6 with Windows 2008 R2
  • Defined requirements and designed, evaluated and supplied PVS images, sequencing with App-V Sequencer 
Technologies 
  • Citrix Provisioning Services | Citrix XenApp 6 | Windows 2008 R2 Server | Windows 7 | Microsoft App-V | Openlink Endur | Mathworks Matlab

Senior ConsultantDec 2010 – Aug 2011

Energy Provider, Switzerland 
Responsibilities 
  • Accountable for designing and installing a Citrix Presentation Server platform for International Energy Trading with Ednur, Mesap, Tryport, Elviz, Xetra/Eurex, including creating images
  • Implemented, operated and provided training on Mathworks Matlab, with a Parallel Toolbox, Financial Toolbox, Database Toolbox and IBM Cplex
Technologies 
  • Citrix Provisioning Services | Citrix Presentation Server 4.5 | Windows 2003 Server | Citrix CAG, HP SAN

Senior ConsultantNov 2008 – Nov 2009 

[Company Name] [Company City/Country]
Responsibilities 
  • Accountable for designing and implementing Citrix Provisioning Services, including generating images 
Technologies 
  • Citrix Provisioning Services | Citrix Presentation Server 4.5 | Windows 2003 Server | Citrix CAG, HP SAN  

Senior ConsultantNov 2007 – Oct 2008

Tourism, UK / Germany 
Responsibilities 
  • Accountable for managing a data centre migration from Coventry to Hannover, creating an effective concept for an Exchange and AD migration and installing a ESX Server Farm and Citrix Farm
  • Effectively planned a new VMWare virtual infrastructure 3 environment, consisting of HP Blade-Centre, HP Blades, HDS Storage System and Brocade SAN
  • Conceptualised the implementation of a Citrix Farm on virtual servers, Thin Clients virtualisation of Windows and Linux servers with Platespin and migrated VMs into the new infrastructure
  • Introduced a new web-based booking system and facilitated the AD user migration 
Technologies 
  • Windows 2003 Server | MS Exchange | VMware ESX | Citrix | Platespin

Technical Project Manager, Senior ConsultantSep – Oct 2007

Bank, Switzerland 
Responsibilities 
  • Accountable for consolidating AD and Exchange through analysing Windows Server Systems, compiling optimisation proposals, conceptualising ideal Mail Archival storage solutions and Fail over Security for Mail systems
Technologies 
  • Windows 2003 Server | MS Exchange

Senior Consultant Nov 2006 – Aug 2007

Bank Switzerland 
Responsibilities 
  • Accountable for optimising developing and migrating Citrix Server Farm, VMware and introducing SharePoint            
  • Generated an operational concept for VMware ESX Farm, developed and assisted with the ESX Farm and identified and resolved performance issues
  • Migrated ESX 2.5 to VI3, with minimal disruption 
  • Provided project server virtualisation for international locations
  • Consolidated and enhanced Citrix Presentation Server 4 Farm and migrated to Presentation Server 4.5
Technologies 
  • VMware ESX | MS SharePoint | Windows 2003 Server | Citrix Presentation Server

Senior ConsultantJul – Oct 2006

Bank, Switzerland 
 

Senior Consultant Jan – Jul 2006

Bank Switzerland 
 

Senior Consultant, Technical Project ManagerMay – Dec 2005

Insurance Company, Switzerland 
 

Technical Project ManagerApr 2005

Telecommunications, Germany 
 

Consultant, AdministratorApr 2004 – Mar 2005

Energy Provider, Switzerland
 

ConsultantJan – Feb 2004

T-Mobile, PLACE

Reisebereitschaft

Verfügbar in den Ländern Deutschland, Österreich und Schweiz
Profilbild von Alexander Laechele Project Manager aus Olten Project Manager
Registrieren