PROJEKTHISTORIE
Customers/References:
GE-General Electric (formerly Alstom) Switzerland AG
ZF AG - Friedrichshafen
Porsche AG - Stuttgart
SIX Group AG – ZH - Switzerland
Telekurs AG - ZH - Switzerland
Mettler-Toledo AG - Greifensee - Switzerland
Huber und Suhner AG Herisau - Switzerland
IBM Switzerland AG
Lonza AG Switzerland
T-Systems GmbH Stuttgart-Leinfelden
Daimler AG – Stuttgart
Comparex - Stuttgart
Roto-Frank AG - Stuttgart
Universitätsklinikum Ulm
ZF-Lenksysteme – Schwäbisch Gmünd
Reinz AG - NeuUlm
Cablecom - ZH - Switzerland
The most actually and important Projects of the last 6 years :
2014/11 - 2017/10 : GE General Electric
Project-Description :
Operation complete Landscape of PowerMAX : ERP, PI/PO, BI, Portal, ME/MII
SLT - SAP Landscape Transformation all Systems before Migration to HANA
System-Migration to US SLT per GoldenGate O2O
DataCenter Migration CH to US
Implementation Projekt ME/MII
Upgrade Portal NW7.4, 7.5
Upgrade PI/PO 7.31
Upgrade ERP6-EHP7
Upgrade BW 7.4
Upgrades and Patching ME/MII
Migration NWDI
PoC-Project Hana S4 , Migration Oracle – Hana 2.0
Migration Project SLO
Implementation and Migration to Hana on Power8
Platform, Database :
AIX 7.1 , AIX-HACMP , MS 2008R2 , Oracle12c , HANA 2.0 , HANA S4
2014/01 - 2015/08 : ZF AG Friedrichshafen
Project-Description :
Upgrade Portal NW731, NW7.4
Operation ERP, PI, BI, Portal
Platform, Database:
MS 2008R2 , Oracle11g, Linux x86_64, AIX 7.x
2012/08 - 2014/07 : Mettler-Toledo International AG
Projekt Description :
eShop/eCommerce, WebChannel CRM701
Behebung TREX-Probleme, NeuAufbau NWDI fuer PI/PO7.3x
Upgrades CRM7x
Platform, Database:
MS 2008R2 , MSSQL 2008 R2 , MSCS, VMware5.1
01/2012 - 10/2012 : IBM-Schweiz AG // elected as IBM Reference-Project
Projekt Description :
OS-DB-Migrationen Oracle => DB6 LUW
Platform, Database :
MS 2008R2 , DB2 v9.7 , Oracle 10.2.0.x
2012/01 - 2013/02 : Porsche AG
Projekt Description :
CUUC Upgrades incl UC-Migration BW3.5 to NW-BI-730
Datenbank 4,8 TB
Performance-Analysen
Upgrades CRM4.0 nach CRM70 EHP1 NW702
Upgrades ERP60 EHP5
Hardware-Migratons to hppa64, hpia64 to Linux x64
Platform, Datenbank:
hpux, Linux_x64 , Oracle 10g, Oracle 11g
2010/04 - 2011/12 : Huber Suhner AG
Project Description :
Kompletter Neu-Aufbau einer vollstaendigen Umgebung fuer
ERP604, SCM701 mit LiveCache, PI71, Adapter Engine, ADS-Adobe Document Services, BI701, TreX7.0, WebDispatcher
Projekt-Betrieb ERP, SCM, LC, PI, BI
EHP-Installation NW70-EHP1
EHP-Installation PI71-EHP1
Platform, Database :
MS 2008R2 , MSSQL 2008 R2 , MSCS, VMware4.1,5.0
2010/10 - 2011/12 : Porsche AG
Project Description :
OS-Migration R3 4.7-System, CUUC-Upgrade R3 4.7 nach ERP604
CUUC-Upgrades SCM5.0 nach SCM701 inclusive LiveCache
CUUC-Upgrades CRM4.0 nach CRM701
Hardware-Uebernahmen, Migrationen hppa64, hpia64 nach Linux x64
Performance-Analysen
Platform, Database:
hpux, Linux_x64 , Oracle 10g, Oracle 11g
01/2009 - 03/2010 : Six-Group AG
Projekt Description :
Betrieb ERP, BI, CRM, Portale in einer 3 Firmen-Fusion
NW70-EHP1 Upgrades
PI71-EHP1 Upgrades
Aufbau PI7.0- Triple unter Windows 2003, MaxDB 7.7
und PI7.1-Triple unter Solaris10, Oracle10.2.x
Implementierung EBPP jeweils in Version 4.0 und 3.0
d.h. PI7.1 - EBPP , Konfiguration Integration-Repository (Integration Builder) , Communication Channels, Interface-Determination, Sender-/Receiver-Agreement/Determination , Mapping , File-Adapter, Converter Soap-to-File und File-to-Soap , Soap-Adapter
Verschiedene Schnittstellen-Scripte SFTP, SCP als Ergaenzung zum Seeburger File-Adapter
CRM5.0 - Migration to Unicode und 64Bit
Upgrade und Betrieb ERP, BI, CRM, Portale in einer Fusion von 3 Firmen
ca 20 Neu-Installationen ERP60 , NW70, EHP3- und EHP4-Upgrades, Upgrade CRM70
Betrieb Alt-Systeme SAP R/3 4x , mySAP ERP.
Platform, Database:
Solaris10, Solaris11, Oracle10.2.x, Oracle11g, Win003, Win2007
2009/01 - 2009/10 : University Clinikum Ulm
Hardware-, UC- und 64Bit-Migration HR-Systeme, Solution-Manager-Systems 7.1, BI-Systems, ERP-Systems
24 Systems DB-Upgrade Oracle 10.2.x to Oracle11g
Upgrade BW-Systems BW7.0 , ERP to ECC6
Platform, Database :
Oracle 10.2.0.2 , Oracle11g , WinServer2003, WinServer2007
2006/021- 2006/09 : Comparex AG , University Clinikum Ulm
Project Description :
Platform-Migration , Libelle
OS-DB-64Bit-Migration of 4 ERP-Systems hpux to Win2007 including several Applicationsservers
Platform, Database :
SAP ECC 6.0 Oracle 10.2.0.2 , Oracle11g , Libelle ,
Migration-Monitor, Distribution Monitor
2005/08 - 2009/07 : Porsche AG
Project Description :
Operation-Support and Coaching of Administrators, Performance-Analyses ERP, SCM, APO, BI
Analysis and Solution of Performance-Problems especially for the Main-ERP-Systems and in a Second Phase BI , SCM und CRM
SAP 4.7 , ECC5 , APO3.0 , BI 3.5, BI 7.0, CRM5.0
Platform, Database:
SAP 4.7 , ECC5 , APO3.0 , BI 3.5, BI 7.0, CRM5.0, Ora 9.2.0.7 , Ora 10.2.0.2 , hpux , MC-ServiceGuard Cluster , Linux