Schlagwörter
SAP Applications
Computerprogrammierung
Pharmazie
Primavera
Automatisierung
Investitionen
Datenmanagement
Anlagen-Engineering
Oracle Databases
Prototyping
Skills
A/1995 – M/1995 MAN GHH Blast-Furnace CSI-Planos SPANIEN
Time Schedule: Overall-Schedule implementation of 13 Consortial-partners
1995 – 1996 VOEST -FINMET Australien
Detail-Time-Schedules for local Equipment (Southafrica)
Equipment for COREX 2000 Plant.
1997 – 1998 Fa.EDAG / Proton Malaysia
Time Schedule development of new cars
Technical Construction to manufacturing of tools and production
Interfaces to Proton-Systems.
1999 – 2002 Logistikplanung M+-Dedon
Time Scheduling ,
Interfaces to Client Databases
(electronic Freight-Letter).
2003 – 2005 VOEST ALPINE Stahl Blast-Furnace A
- System Prototyp Access / VBA
- Specification for SAP-Adaption (Shutdown to New Startup within 100 days)
Concept and programming (VBA) for handling with
electronical freight-letter.
2005–2009: SIEMENS-VAI-Linz: Industrieanlagenbau
Time Scheduling for Strip Rolling Mill Projects: Setup of Project Time Schedule (Network CPM) based on Technical Spezifications and Project
Parameters for following Projects: > VA-Stahl – LINZ: Konti-Tandem-Walzstrasse (M/2005 – A/2007) > VA-Stahl – LINZ: Schubbeize (M/2005 – A/2007) > Dunaferr – Ungarn: Beize-Tandem-Strasse (A/2007 – M/2008) > Bokaro – Indien: Beize-Tandem-Strasse mit Galvanisierung (M/2008-2009.)
2009– 2010: Fa. MCE AG: STAHL-&MASCHINENBAU
Time Scheduling for AIRBUS / PreFAL A350XWB Setup of Project Time Schedule for Installation of Airplane-Structure
(Assembly Line and final Erection of A350XWB in Hamburg and Nordenham,
based on Contractual Parameters and
Technical-& Commercial Objectives. Time Scheduling ,
Interfaces to Client Databases
(electronic Freight-Letter). - Hochofen A: Coordination of Logistic-Activities - System Prototyp Access / VBA
- Specification for SAP-Adaption (Shutdown to New Startup within 100 days)
Concept and programming (VBA) for handling with
electronical freight-letter.
2010– 2011: Fa. MAN Diesel & Turbo
Timescheduling for Power Plants -Commissioning Setup of Overall Standard Time Schedule for Power Plants
Integrated Personal-Ressource Schedule
Site Activities with Interface to Ressource Pool.
Project Needs / Actual Ressource Status
2011 – 2012: Fa. ep-cm (Auftrag SHELL Deutschland Oil / SDO)
DDM-Document- & Data-Management: Time- & Ressource Planning:
Overall Concept for Time-/ and Ressource Schedule
(WBS-Strukture all Investments / SAP-Orders),
Ressource-Pools / Ressource Needs
Setup of operative EDP-Tool for Ressource Scheduling and Controlling,
based on MS-Project (Ressource-Pool / Scheduled Needs). 2012 – 2014: Fa. ep-cm (Auftrag OMV Austria)
Time Schedule Refining – Plants / Projects:
Setup Overall Project Time Schedule
Concept of general Project Structure / WBS
(Technical Specification , scope list)
Commercial agreements and Cost Control.
2014 – 2015: Fa. ep-cm (Auftrag FMT Austria)
Cost-Control for Industrial-Plants: Erection-work:
Setup of Project Time Schedule
Controlling-System for site activities (manhours and progress)
Interface SAP Cost Control
Interface client systems
2015 – 2016: Fa. NOVARTIS Pharma Industries (Schweiz Fa.Swissroll)
Time Scheduling Pharma-Industrial-Plant – (Engineering to Commissioning)
Erection-time-schedule for automation system and interfaces to
mechanical equipment and IT.
Controlling and Reporting-system.
Analyses against Baseline,
(Export Primavera/Oracle-Database via VBA- Programming Import in
EXCEL-Report-Templates).
2016 – 2017 Fa. GUNVOR-Raffinerie, Ingolstadt
Time Scheduling Refinery – Turnaround Project
Project-time-schedule, detailed erection steps for all disciplines,
Controlling-system and Reporting
2017 – 2018 UNHCR Flüchtlingswerk
Voluntary work as construction supervisor in building Refugee camps in Syria and Turkey
1995 – 1996 VOEST -FINMET Australien
- Setup of General Project Time Schedule
- Project-controls Time & Costs
Detail-Time-Schedules for local Equipment (Southafrica)
Equipment for COREX 2000 Plant.
1997 – 1998 Fa.EDAG / Proton Malaysia
Time Schedule development of new cars
Technical Construction to manufacturing of tools and production
Interfaces to Proton-Systems.
1999 – 2002 Logistikplanung M+-Dedon
Time Scheduling ,
Interfaces to Client Databases
(electronic Freight-Letter).
2003 – 2005 VOEST ALPINE Stahl Blast-Furnace A
- System Prototyp Access / VBA
- Specification for SAP-Adaption (Shutdown to New Startup within 100 days)
Concept and programming (VBA) for handling with
electronical freight-letter.
2005–2009: SIEMENS-VAI-Linz: Industrieanlagenbau
Time Scheduling for Strip Rolling Mill Projects: Setup of Project Time Schedule (Network CPM) based on Technical Spezifications and Project
Parameters for following Projects: > VA-Stahl – LINZ: Konti-Tandem-Walzstrasse (M/2005 – A/2007) > VA-Stahl – LINZ: Schubbeize (M/2005 – A/2007) > Dunaferr – Ungarn: Beize-Tandem-Strasse (A/2007 – M/2008) > Bokaro – Indien: Beize-Tandem-Strasse mit Galvanisierung (M/2008-2009.)
2009– 2010: Fa. MCE AG: STAHL-&MASCHINENBAU
Time Scheduling for AIRBUS / PreFAL A350XWB Setup of Project Time Schedule for Installation of Airplane-Structure
(Assembly Line and final Erection of A350XWB in Hamburg and Nordenham,
based on Contractual Parameters and
Technical-& Commercial Objectives. Time Scheduling ,
Interfaces to Client Databases
(electronic Freight-Letter). - Hochofen A: Coordination of Logistic-Activities - System Prototyp Access / VBA
- Specification for SAP-Adaption (Shutdown to New Startup within 100 days)
Concept and programming (VBA) for handling with
electronical freight-letter.
2010– 2011: Fa. MAN Diesel & Turbo
Timescheduling for Power Plants -Commissioning Setup of Overall Standard Time Schedule for Power Plants
Integrated Personal-Ressource Schedule
Site Activities with Interface to Ressource Pool.
Project Needs / Actual Ressource Status
2011 – 2012: Fa. ep-cm (Auftrag SHELL Deutschland Oil / SDO)
DDM-Document- & Data-Management: Time- & Ressource Planning:
Overall Concept for Time-/ and Ressource Schedule
(WBS-Strukture all Investments / SAP-Orders),
Ressource-Pools / Ressource Needs
Setup of operative EDP-Tool for Ressource Scheduling and Controlling,
based on MS-Project (Ressource-Pool / Scheduled Needs). 2012 – 2014: Fa. ep-cm (Auftrag OMV Austria)
Time Schedule Refining – Plants / Projects:
Setup Overall Project Time Schedule
Concept of general Project Structure / WBS
(Technical Specification , scope list)
Commercial agreements and Cost Control.
2014 – 2015: Fa. ep-cm (Auftrag FMT Austria)
Cost-Control for Industrial-Plants: Erection-work:
Setup of Project Time Schedule
Controlling-System for site activities (manhours and progress)
Interface SAP Cost Control
Interface client systems
2015 – 2016: Fa. NOVARTIS Pharma Industries (Schweiz Fa.Swissroll)
Time Scheduling Pharma-Industrial-Plant – (Engineering to Commissioning)
Erection-time-schedule for automation system and interfaces to
mechanical equipment and IT.
Controlling and Reporting-system.
Analyses against Baseline,
(Export Primavera/Oracle-Database via VBA- Programming Import in
EXCEL-Report-Templates).
2016 – 2017 Fa. GUNVOR-Raffinerie, Ingolstadt
Time Scheduling Refinery – Turnaround Project
Project-time-schedule, detailed erection steps for all disciplines,
Controlling-system and Reporting
2017 – 2018 UNHCR Flüchtlingswerk
Voluntary work as construction supervisor in building Refugee camps in Syria and Turkey
Projekthistorie
siehe job list
Reisebereitschaft
Verfügbar in den Ländern
Deutschland