Profilbild von Michael Thiemicke QM Manager, Project engineer Superintendent E&I, Project engineer commissiong E&I aus Terhole

Michael Thiemicke

verfügbar

Letztes Update: 06.09.2022

QM Manager, Project engineer Superintendent E&I, Project engineer commissiong E&I

Firma: Engineering Michael Thiemicke
Abschluss: Elektrotechnik MSR
Stunden-/Tagessatz: anzeigen
Sprachkenntnisse: deutsch (Muttersprache) | englisch (gut) | niederländisch (gut) | spanisch (gut)

Dateianlagen

CV English Update 2021 aktuell (33).docx

Skills

MS Office, MS Windows, MS Project, DOS, SAP/R3, Bradley, Applicom in touch, Hartmann, Braun Contronic C/E/P, Siemens Teleperm ME, Veritas, TRD, ATEX, ISA, ISO, osmosis, AVR, GIS, GIS/20KV/10KV, PS2, programming, visualisation, GPS

Projekthistorie

01/2019 - 06/2021
QM Manager
BMW San Luis Potosi Mexico BSB

Check of climate and ventilationsystems (ca.180 000m2)due
to the maintenance conditions/adjust air volumes/check watertreatment/osmosis/vaccinationsytems/coldwatersystem

01/2003 - 06/2021
Project Engineer Vattenfal/Jaenschwalde
ABB Utilities

Renewing Plc-System Contronic-E/ABB Maestro
Configuration of software, commissioning, restart of plant.
ABB Utilities, Minden

01/2016 - 12/2017
Project engineer Superintendent E&I
EREM Wastetreatment

EREM Wastetreatment(Fluidized bed furnace) Corlou/Turkey
Mechanical completion E&I/Loop check/Preperation for Startup
Switchgear 6KV/Roatating Equipment/Analyzes/Conveyerbelts/
Silos/Burner/Turbine 40MW/Dosing/Drums/Condenser/Boiler
Outotec-Istanbul

01/2013 - 12/2015
Project engineer commissiong E&I
Buss-Chem

Gulfflour Aluminiumflouridplant Abu Dhabi
Mechanical completion E&I/Loop check/Functional logic test
Commissioning subsystems burners(Maxon)bucketelevators(Emde)
Prereactor(Compound)Scales(Schenk)Packing(H&B)Rotary-kiln
(Emde)Fianal take over to he client/Documentation
Buss-Chem-Tec -Switzerland Pratteln

01/2012 - 01/2013
Project engineer commissioning E&I (QA/QC)
TENNET

TENNET offshore Dolwin1 Projekt 800MW
Projektcoordination and commissioning 420KV/155KV GIS/20KV/10KV switchgear/400V switchgear (ABB)
FAT software cause&effects fire&gas,Emergencypower
Sweetwater Osmose.LivingQuater,Safteyequipment
TENNET -Netherland Zwijndrecht

01/2011 - 01/2012
Project engineer
Outotec-Kolkatta

TATA-steel Jamshedpur/India (1.5million/t pelletplant)
Burners/mixing/conveyers/scrusher/screening/discs/firefighting
fluegas analyzers/fuelfarm
Outotec-Kolkatta

01/2010 - 01/2011
Project engineer process/fieldinstalation
Naturel gas storage; Metering EON

Naturel gas storage Etzel
Gascompressors(GE 200bar)Glycolinjektion/Pre-heaters/Glycolabsorbers/Incoming
filters/Measurements,Metering EON Gelsenkirchen

01/2007 - 01/2010
Supervisor/Site manager
Lurgi/Airliquide

Re-commissioning after damage from MEGA-Methanol plant
Instrumentation /Transmitter(ABB/Rosemount/Yokogawa)
DCS Yokogawa
Creating complex loops / Cause &effects/ Controller Tuning
startup
Lurgi/Airliquide Frankfurt

01/2006 - 01/2007
Supervisor
Siemens Offenbach/Mymensingh/Bangladesch Siemens

Fieldinstalation E-technic/instrumentation
commissioning supervision electric and instrumentation for 4 heat recovery boilers / Condenser /
water treatment plant
Bypasstation
SIPOS/SIPART-PS2/SITRANS/SIPROTEC-Generator Digsi4
Siemens Offenbach/Mymensingh/Bangladesch Siemens

01/2004 - 12/2005
Supervisor PLC, E & I&C
RWE-Solution Duisburg

Commissioning FGD plant 4x500MW- Cottam Power Plant / UK
Client for EDF.
Operating during garantie,Handover to the client,Stafftraining
Plant, RWE Solutions - Dusiburg
RWE-Solution Duisburg

01/2001 - 12/2002
Project Engineer
GEEP; Alstom

Material handling / Storekeeping/creating store program/
materialflow (UN-embargo).
Rehabilitation of 3 gas turbines GT13 (120MW).
functional test of instrumentation/E-technology before restart
balancing of rotor
Alstom Mannheim

01/2000 - 01/2001
Commissioning Engineer
Cadagua; Baker Hughes

Commissioning of sewage sludge installation (combustion technology)
E-technology/switchgear /S5 programming/ visualisation applicom in touch 7.1
Creating program/ commissioning field equipment I&C/ analyses/ rotating equipment, combustion
installation/
personnel training performance test & optimisation / authority - client acceptance / as-built
documentation
Baker Hughes/Koeln

01/1999 - 01/2000
Project Engineer
Siemens KWU

Pressurized water reactor 1200MW
Pre commissioning from several Subsystems
Signal check: Field/junction box/PLC-system/control room/
failure control commissioning field equipment / switchgear/ rotating equipment.
Adjustment and configuration of regulator / as built documentation. PLC-system: Siemens
Iskamatic/A/B/C
Siemens KWU, Erlangen

01/1998 - 01/1999
Commissioning Engineer
KW; PLC-system: Siemens Teleperm ME.; Siemens GEA

Plant gas/steam GuD
Commissioning of feed water system/HP-LP bypass/ condenser (2nd largest o. world) Signal check
field/PLC-system/switchgear/ 6KV/400KV test function groups/
commissioning mechanics/pumps/gears/motors, etc. performance test/ personnel training / as built
documentation
PLC-system: Siemens Teleperm ME.
Siemens GEA, Erlangen

01/1997 - 01/1998
Finalisation Manager
GECOL Tripoli Libya; ABB

In relation to a punch list the client claims $100 mio.
The power plants where located:
Tripoli south 6Gastrubines GT13D
Khoms 4Gasturbines GT13E
Benghazi 3Gasturbines GT13E
Zuwetina 4Gasturbines GT8
Main problems located by SFC starting device / generator protection / excitation AVR battery charger
/ switchgear 6KV/400V / natural gas compressors / fuel forwarding station radio transmitted signals
/ GPS/ etc.
Coordination of work / acceptance documentation.
PLC-systems: ABB P13/P14 Siemens S5
GECOL Tripoli Libya
ABB Baden, Switzerland

01/1994 - 01/1997
Project Engineer/Superintendent E-Technic
ABB KWL

ALBA Bahrein, power plant gas/steam
KW-Rostock, coal plant
BASF Ludwigshafen, gasturbine GT24/Boiler
HKW-Frankfurt, gas turbine GT13 Boiler
Commissioning div. subsystems / switchgear / I&C/ adjustment of regulator etc.
PLC-system: ABB P13/P14/PROSYS
ABB KWL, Mannheim

01/1988 - 12/1994
Project Engineer Ethylenplant
Linde AG Höllriegelskreuth; BASF; LINDE/YPC Nangjing / VR China

Basic Engineering vapour generator / boilers gas compressor / fire fighting system, data sheets /
order specifications / wiring diagrams. Erection control subcontractors
Loop check / commissioning
PLC-system: Contronic E
BASF Antwerpen / Belgium

Superintendent E&I Liquid Ethyenplant YPC
Erection control instrumentation /E-technology/Ex/Exi
Plant operates by- 108grd/Celsius and includes mainly Tank storage/ in - and export pumps/ cooling
stations (ammonia) /yeti, / Flare / fire fighting installations. Commissioning instrumentation/
E-technology
As built documentation /User manuals
LINDE/YPC Nangjing / VR China

01/1988 - 01/1994
Project Engineer

Plant- /erection management / commissioning
Hydrogen-oxygen compressors
Pressure tests/ Helium leak test
Fuel cells / analyse equipment H&B Utrans / tanks / Fuel station (cars) Loop-and signal check /
function controls/ implementation in Plc-system authority acceptance, as built documentation Linde
AG Höllriegelskreuth
Ethylenplant VEBAGelsenkirchen
Commissioning, emergency switch off an relaxtion system
Signal check/ field / switchgear / Plc-system / Switch off panel
Plc-system: Contronic P / HIMA
Authority acceptance / preparation of tests
As built & test documentation, performance test.

01/1985 - 12/1987
Project Engineer
BP/ERIAG; Undergroundgasstorage ӦVA; Hartmann & Braun FFM

Ethylenplant BP/ERIAG Ingolstadt
Configuration of Plc-system CONTRONIC P
Based on datasheets / I&C diagrams configuration of system software. Test field check electronic
equipment / client acceptance
BP/ERIAG Ingolstadt
Hartmann & Braun FFM

Tank field STATOIL Mosselbay South Africa
Configuration of Plc-system CONTRONIC E
Based on data sheets / I&C diagrams configuration of system software
Test field check electronic equipment / client acceptance
Commissioning instrumentation / plant optimalisation Hartmann & Braun FFM


Undergroundgasstorage ӦVA Vienna
Configuration of Plc-system CONTRONIC E
Based on data sheets / I&C diagrams configuration of system software. Test field check electronic
equipment / client acceptance
Commissioning instrumentation / plant optimalisation
Hartmann & Braun FFM

01/1984 - 01/1985
Project Engineer
Hoechst

Engineering instrumentation / E-technology
Boiler until / Oilfireing /90 MW steam turbine
Creating wiring diagrams / I&C layouts/order & bit specifications / Control room planning, user
manuals
Hoechst, Gersthofen

Reisebereitschaft

Weltweit verfügbar
Ja/International
Profilbild von Michael Thiemicke QM Manager, Project engineer Superintendent E&I, Project engineer commissiong E&I aus Terhole QM Manager, Project engineer Superintendent E&I, Project engineer commissiong E&I
Registrieren